Attention: Have only 1 page to see today

Author Topic: New Transom on my 250 CCP  (Read 3516 times)

March 04, 2010, 07:44:11 PM
Reply #15

ANTIBLING

  • Information Offline
  • Posts: 103
Re: New Transom on my 250 CCP
« Reply #15 on: March 04, 2010, 07:44:11 PM »
looks great! Job well done.
87\' 170 striper

March 04, 2010, 11:45:54 PM
Reply #16

LilRichard

  • Information Offline
  • Master Rebuilder
  • Posts: 1244
Re: New Transom on my 250 CCP
« Reply #16 on: March 04, 2010, 11:45:54 PM »
Looks good... see you at beercan soon!

March 08, 2010, 04:25:41 PM
Reply #17

billsaquasport

  • Information Offline
  • Posts: 46
Re: New Transom on my 250 CCP
« Reply #17 on: March 08, 2010, 04:25:41 PM »
Rickk,

Yes I did pour all the way up the sides. The Arjay stops about 2-3 inches from the top. I actually have two downrigger rod holders on the back of the boat I removed and poured the Arjay through the holes into the top outside of the transom. The only reason I did not go to the very top was I couldnt really get to it and I needed the back side just lower so I could run a hose from the funnel into the cavity for the Arjay.

 


SimplePortal 2.3.5 © 2008-2012, SimplePortal