You reached the limit of pages to see for today

Author Topic: Mike's 77 22-2 Rebuild  (Read 31594 times)

November 15, 2018, 06:05:06 PM
Reply #135

Marcel4t

  • Information Offline
  • Posts: 131
Re: Mike's 77 22-2 Rebuild
« Reply #135 on: November 15, 2018, 06:05:06 PM »
Nice!  So many of Shines pictures will not show up for me, the early ones especially, not sure why.
1971 222

November 15, 2018, 06:38:40 PM
Reply #136

RickK

  • *****
  • Information Offline
  • Administrator
  • Posts: 11277
Re: Mike's 77 22-2 Rebuild
« Reply #136 on: November 15, 2018, 06:38:40 PM »
The original rebuild is over on Bateau2.com https://forums.bateau2.com/viewtopic.php?f=10&t=11294
Rick
1971 "170" with 115 Johnson (It's usable but not 100% finished)

1992 230 Explorer with 250 Yamaha

November 15, 2018, 07:25:07 PM
Reply #137

Tampa Bay Mike

  • Information Offline
  • Master Rebuilder
  • Posts: 579
Re: Mike's 77 22-2 Rebuild
« Reply #137 on: November 15, 2018, 07:25:07 PM »
This is the page I have bookmarked for his rebuild. I've referred to it several times already and I'm sure this won't be the last idea I borrow from him.

 https://boatbuildercentral.wordpress.com/2015/10/29/an-in-depth-rebuild-of-a-classic-aquasport-22-flatback/

November 15, 2018, 11:14:32 PM
Reply #138

Marcel4t

  • Information Offline
  • Posts: 131
Re: Mike's 77 22-2 Rebuild
« Reply #138 on: November 15, 2018, 11:14:32 PM »
Oh I didn't know that was the same dude. I read that post once many years ago and when I started thinking about getting it flatback. Awesome!
1971 222

November 18, 2018, 09:21:13 PM
Reply #139

Tampa Bay Mike

  • Information Offline
  • Master Rebuilder
  • Posts: 579
Re: Mike's 77 22-2 Rebuild
« Reply #139 on: November 18, 2018, 09:21:13 PM »
Got a few hours in this weekend. Finished marking out everything I needed to while I had the floor in the boat and cut out the bulkheads.



Then I pulled the panels back out, cleaned up the edges with the router, and set them all back in the shop so I can get ready to cut out the hatches and such.



It looks like the layout I went with is going to work really well. Everything is kinda falling into place just right.

November 19, 2018, 04:57:18 AM
Reply #140

RickK

  • *****
  • Information Offline
  • Administrator
  • Posts: 11277
Re: Mike's 77 22-2 Rebuild
« Reply #140 on: November 19, 2018, 04:57:18 AM »
Looking good!  Man that is a huge livewell.
Rick
1971 "170" with 115 Johnson (It's usable but not 100% finished)

1992 230 Explorer with 250 Yamaha

November 19, 2018, 07:13:48 AM
Reply #141

Tampa Bay Mike

  • Information Offline
  • Master Rebuilder
  • Posts: 579
Re: Mike's 77 22-2 Rebuild
« Reply #141 on: November 19, 2018, 07:13:48 AM »
Looking good!  Man that is a huge livewell.

It must be the camera angle. It's actually only about 21 gallons. That's why I'm comfortable putting it so far back.

November 20, 2018, 06:10:21 PM
Reply #142

Marcel4t

  • Information Offline
  • Posts: 131
Re: Mike's 77 22-2 Rebuild
« Reply #142 on: November 20, 2018, 06:10:21 PM »
Looking good, I was debating on the bait death row on transom or leaning post. Id like around 40g, so I'll go with a leaning post/well combo.  Question, how have you decided to run your rigging tubes?  That console looks very narrow, and Im imagining the tank will be underneath it?  Im having difficulty planning on the best way to run my tubes.   
1971 222

November 20, 2018, 06:44:43 PM
Reply #143

RickK

  • *****
  • Information Offline
  • Administrator
  • Posts: 11277
Re: Mike's 77 22-2 Rebuild
« Reply #143 on: November 20, 2018, 06:44:43 PM »
I still trying to figure out how he's going to secure that helm seat in the pic  :57:  :93:
Rick
1971 "170" with 115 Johnson (It's usable but not 100% finished)

1992 230 Explorer with 250 Yamaha

November 20, 2018, 07:21:38 PM
Reply #144

mshugg

  • Information Offline
  • Master Rebuilder
  • Posts: 951
Re: Mike's 77 22-2 Rebuild
« Reply #144 on: November 20, 2018, 07:21:38 PM »
I still trying to figure out how he's going to secure that helm seat in the pic  :57:  :93:

How about a giant spring?

November 20, 2018, 07:26:58 PM
Reply #145

Tampa Bay Mike

  • Information Offline
  • Master Rebuilder
  • Posts: 579
Re: Mike's 77 22-2 Rebuild
« Reply #145 on: November 20, 2018, 07:26:58 PM »
Question, how have you decided to run your rigging tubes?  That console looks very narrow, and Im imagining the tank will be underneath it?  Im having difficulty planning on the best way to run my tubes.

I was planning the normal route of 3-4" pvc glassed to the inside of the stringers. I was also planning a small hatch inside the console to access the sending unit if need be, so I'll have to be pretty precise with where the tubes come up.

November 20, 2018, 07:27:44 PM
Reply #146

Tampa Bay Mike

  • Information Offline
  • Master Rebuilder
  • Posts: 579
Re: Mike's 77 22-2 Rebuild
« Reply #146 on: November 20, 2018, 07:27:44 PM »
I still trying to figure out how he's going to secure that helm seat in the pic  :57:  :93:

I can stick anything down with enough epoxy!  :93:

November 20, 2018, 08:14:36 PM
Reply #147

mshugg

  • Information Offline
  • Master Rebuilder
  • Posts: 951
Re: Mike's 77 22-2 Rebuild
« Reply #147 on: November 20, 2018, 08:14:36 PM »
Curious, what do you fish for?  One thing’s sure: you’ll have plenty of space. 

November 21, 2018, 07:03:24 AM
Reply #148

Tampa Bay Mike

  • Information Offline
  • Master Rebuilder
  • Posts: 579
Re: Mike's 77 22-2 Rebuild
« Reply #148 on: November 21, 2018, 07:03:24 AM »
Curious, what do you fish for?  One thing’s sure: you’ll have plenty of space.

The usual inshore stuff, snook reds and trout in the bays, and tarpon along the beaches, around the skyway and egmont. Plus I do a lot more sandbar hopping now with the family so space for all their stuff is important.

November 25, 2018, 06:59:31 PM
Reply #149

Tampa Bay Mike

  • Information Offline
  • Master Rebuilder
  • Posts: 579
Re: Mike's 77 22-2 Rebuild
« Reply #149 on: November 25, 2018, 06:59:31 PM »
Slowly but surely. Got the bulkheads glassed with a layer of 1708 on each side, stuck in place with some thickened epoxy and then taped down with 1700. I also glassed up a scrap piece of coosa and ripped it into 1" strips that I will glue to the top to use as cleats for the deck seams to rest on. I also ripped down a 3" piece of PVC that I epoxied down to set the tank on.


 


SimplePortal 2.3.5 © 2008-2012, SimplePortal