im going to cut out my floor leaving about 2 inches all the way around. when i lay in the new floor should I lay it on top of that 2 inches and tab in from there?
or does it but up to the 2 inches and get tabbed in?
if I laid it on top wouldnt it raise the height of my new floor and need to build the stringers up higher?