Welcome, Guest
Login
Register
Search
Home
Forum
Help
Site Rules
Advertise
Login
Register
Menu
Home
Forum
Help
Site Rules
Advertise
Login
Register
Classic AquaSport
/
Aquasport Model Rebuilds, Mods, Updates and Refreshes
/
Osprey Style Hull Rebuilds
/
22-2 Rebuilds
/
Miss Delmarva 1973 22-2 Rebuild Low Cholesterol Version
Attention: Have only 1 page to see today
« previous
next »
Print
Pages:
1
...
4
5
6
Go Down
Author
Topic: Miss Delmarva 1973 22-2 Rebuild Low Cholesterol Version (Read 5986 times)
March 18, 2013, 08:27:13 PM
Reply #75
seabob4
Information
Rigging Master
Posts:
9087
Re: 1973 22-2 Rebuild
«
Reply #75 on:
March 18, 2013, 08:27:13 PM »
De-rigged.
Logged
Corner of 520 and A1A...
April 08, 2013, 01:49:00 PM
Reply #76
seabob4
Information
Rigging Master
Posts:
9087
Re: 1973 22-2 Rebuild
«
Reply #76 on:
April 08, 2013, 01:49:00 PM »
So, after determining that both engine's rigging and the steering hoses would fit in the rigging sleeve...
Here's what I have come up with, albeit all totally temporary pending approval...and new rigging sleeving...,
Keep in mind, no primer bulbs in the pick as that involves cutting fuel lines, and I don't think we're ready to do that yet.
This ain't gonna be easy, especially getting the holes cut in the sleeving for each break-out point. And I STILL don't like poking holes in that pretty transom. Had to drill 2 today (don't worry, c'sunk, no gel chipping) to secure the rigging and give it the "look" I wanted...
Logged
Corner of 520 and A1A...
April 08, 2013, 01:51:47 PM
Reply #77
seabob4
Information
Rigging Master
Posts:
9087
Re: 1973 22-2 Rebuild
«
Reply #77 on:
April 08, 2013, 01:51:47 PM »
OK Scott, here's the starboard side (port side cut and ground as well) under gunnel glass cut out, and some grinding done...
the speakers fit nicely!
As I was telling you, the pressed in threaded fittings for the brackets are probably 1/4-20...they are.
So now will be the fun part...mounting them.
Logged
Corner of 520 and A1A...
April 08, 2013, 01:53:37 PM
Reply #78
seabob4
Information
Rigging Master
Posts:
9087
Re: 1973 22-2 Rebuild
«
Reply #78 on:
April 08, 2013, 01:53:37 PM »
Electronics are permanently installed and wired...
Battery trays and terminate the cables...
Coming out of the rigging chase up into the console that has yet to be hooked up. The shift/throttle cables and the steering lines.
Logged
Corner of 520 and A1A...
April 08, 2013, 01:56:13 PM
Reply #79
seabob4
Information
Rigging Master
Posts:
9087
Re: 1973 22-2 Rebuild
«
Reply #79 on:
April 08, 2013, 01:56:13 PM »
All is well in rod holder/Hawes pipe land...
Logged
Corner of 520 and A1A...
April 08, 2013, 02:00:37 PM
Reply #80
Aswaff400
Information
Master Rebuilder
Posts:
1627
Re: 1973 22-2 Rebuild
«
Reply #80 on:
April 08, 2013, 02:00:37 PM »
Additional hull guides added
missing bracket on order...
Bracket installed
Logged
Aaron
1996 200 Osprey
SOLD
1968 22-2 Flatback
SOLD
1993 210 Explorer
SOLD
1991 Fountain 31TE
SOLD
1989 Fountain 12-meter
SOLD
1992 Talon F-20
SOLD
2021 Fountain 38TE QUAD 400's
April 08, 2013, 02:09:16 PM
Reply #81
seabob4
Information
Rigging Master
Posts:
9087
Re: 1973 22-2 Rebuild
«
Reply #81 on:
April 08, 2013, 02:09:16 PM »
Under gunnel LEDs, here is a test fit...
Speakers installed, LED tape lights epoxied in place (that's what all the masking tape is for while the epoxy kicked off).
Logged
Corner of 520 and A1A...
April 08, 2013, 02:16:02 PM
Reply #82
seabob4
Information
Rigging Master
Posts:
9087
Re: 1973 22-2 Rebuild
«
Reply #82 on:
April 08, 2013, 02:16:02 PM »
Well, as Scott promised, the "panels" showed up today. 1/16" thick. Yes, that's correct. Scott had told me that the material was a bit flimsy...well, there's flimsy and then there is FLIMSY!
Cut the hole in the dash, leaving as much material as I could to give the "panel" as much backing as I could...
The panel with the switches illuminated...
Wired...
Back lighting...
PVC L-channel attached to the top sides of the switches with 3M 2-sided foam tape (the good stuff, can hang 5 lbs. with it), then 2 strips of blue LEDS attached to the L-channel with the same foam tape.
Effect achieved.
Logged
Corner of 520 and A1A...
April 08, 2013, 02:24:55 PM
Reply #83
seabob4
Information
Rigging Master
Posts:
9087
Re: 1973 22-2 Rebuild
«
Reply #83 on:
April 08, 2013, 02:24:55 PM »
Final engine rigging today, except for hooking up the shift and throttle cables. That will come after I install the binnacle, as we make all our adjustments at the engine end...given a properly installed binnacle.
And adapter ends on the cables?
Trim/Tilt panel of Scott's work...and I didn't know if the little piece of plastic would withstand enlarging the holes without crumbling in my hands...so, I made my own...
switch panel installed and wired, the primer bulbs complete, the forward LEDs complete, the port speaker wired, the console light done, and the trim ring around the footrest secured from the inside...
Logged
Corner of 520 and A1A...
April 08, 2013, 02:28:17 PM
Reply #84
seabob4
Information
Rigging Master
Posts:
9087
Re: 1973 22-2 Rebuild
«
Reply #84 on:
April 08, 2013, 02:28:17 PM »
she is complete, and, save for cleaning, ready to go...
Logged
Corner of 520 and A1A...
April 08, 2013, 02:29:32 PM
Reply #85
Aswaff400
Information
Master Rebuilder
Posts:
1627
Re: 1973 22-2 Rebuild
«
Reply #85 on:
April 08, 2013, 02:29:32 PM »
met up with Scott and Farley over at Bruce's shop this afternoon,
snapped this pic leaving
Logged
Aaron
1996 200 Osprey
SOLD
1968 22-2 Flatback
SOLD
1993 210 Explorer
SOLD
1991 Fountain 31TE
SOLD
1989 Fountain 12-meter
SOLD
1992 Talon F-20
SOLD
2021 Fountain 38TE QUAD 400's
April 08, 2013, 02:31:36 PM
Reply #86
Skoot
Information
Posts:
484
Re: 1973 22-2 Rebuild
«
Reply #86 on:
April 08, 2013, 02:31:36 PM »
Here are the pics from the Miss D splash and King Neptune.
King Neptune and Farley
King Neptune getting her all wet
Logged
Scott
1975 19-6 - 90hp Tohatsu
May 06, 2013, 09:51:11 PM
Reply #87
Skoot
Information
Posts:
484
Re: 1973 22-2 Rebuild
«
Reply #87 on:
May 06, 2013, 09:51:11 PM »
Videos are up.
Miss D, out of the gate. First hole shot, Sweeeeeeeeeeet
http://www.youtube.com/watch?v=GZZ0oqiX ... e=youtu.be
Listen to those mercs run. She ran like a champ
http://www.youtube.com/watch?v=pTvxFGPQqQs
Coming in hott
https://www.youtube.com/watch?v=xRxzS7WCVqI
Logged
Scott
1975 19-6 - 90hp Tohatsu
September 24, 2014, 01:56:17 PM
Reply #88
Capt. Bob
Information
Global Moderator
Posts:
6446
Re: Miss Delmarva 1973 22-2 Rebuild Low Cholestrol Version
«
Reply #88 on:
September 24, 2014, 01:56:17 PM »
Bump
Logged
]
Capt. Bob
1991 210 Walkaround
2018 Yamaha 150 4 Stroke
"Reef or Madness IV"
Print
Pages:
1
...
4
5
6
Go Up
« previous
next »
Classic AquaSport
/
Aquasport Model Rebuilds, Mods, Updates and Refreshes
/
Osprey Style Hull Rebuilds
/
22-2 Rebuilds
/
Miss Delmarva 1973 22-2 Rebuild Low Cholesterol Version
SimplePortal 2.3.5 © 2008-2012, SimplePortal