Attention: Have 2 pages to see today

Author Topic: Nate's 200 Osprey Rebuild  (Read 4151 times)

January 13, 2022, 07:29:23 AM
Reply #60

Tampa Bay Mike

  • Information Offline
  • Master Rebuilder
  • Posts: 579
Re: Nate's 200 Osprey Rebuild
« Reply #60 on: January 13, 2022, 07:29:23 AM »
Thanks. We did take a lot of measurements and even marked the hullsides where the bulkheads are. The hatches are on order so hopefully they should be in soon.

July 17, 2022, 06:39:14 PM
Reply #61

Tampa Bay Mike

  • Information Offline
  • Master Rebuilder
  • Posts: 579
Re: Nate's 200 Osprey Rebuild
« Reply #61 on: July 17, 2022, 06:39:14 PM »
Hey all. I don't have any updated pics right now but the project is still moving along. I stopped by Nate's house this morning to check it out. The floor is glassed down and faired. The floor hatches are all cut out and ready to install. The leaning post/livewell is glassed down and ready for primer, and he glassed some coosa down in preparation to install the console. Going with paint since it was painted previously. All that's left is a little cosmetic work on the gunnel cap, final fairing, primer and paint, electrical and rigging. I'm pushing him to get it done before the end of the summer. Be a lot quicker if he could pick a paint color lol.

 


SimplePortal 2.3.5 © 2008-2012, SimplePortal