Been awhile but back at it. Have all the wood mostly out. Used my chainsaw, which as a former sawyer was actually kind of fun. Now slogging away with the drill. One question I have is what to do about the bilge drain. How do you guys seal this area for the pour. My only access to the interior side is through a pie plate in the deck.