Attention: Have only 1 page to see today

Author Topic: Stringer rebuild question..  (Read 762 times)

February 01, 2012, 02:14:25 PM
Read 762 times

gman 82 aquasport

  • Information Offline
  • Master Rebuilder
  • Posts: 594
Stringer rebuild question..
« on: February 01, 2012, 02:14:25 PM »
Redoing the stringers on a 82 19-6 center console..I have already cut out the wet foam and refoamed the stringers. My question is this , how many layers of 17oz glass do I need to go over the tops of the stringers to reattach them.I cut the tops off and they are back on top of the new foam. I will be adding a layer of ply on top of the reglassed tops to raise the height a little more  to get it closer to the floor bottom and it will be glassed also. Just trying not to put to much or not enough..Thanks
1982 19-6 Osprey
1992 Johnson 150
"THERAPY"
Member # 2331

February 01, 2012, 05:48:07 PM
Reply #1

slvrlng

  • Information Offline
  • Posts: 1817
Re: Stringer rebuild question..
« Reply #1 on: February 01, 2012, 05:48:07 PM »
I would think 2 layers. One that overlaps the edge by about 2 inches, then the second one about 4 inches. Bed the ply then lay another layer that laps over about 6 inches. Then put another one on that goes all the way down the sides of the stringer and laps out onto the hull bottom about 4 inches. If you go this route I would hate to be the guy that ever had to take it out!
Lewis
       1983 222 Osprey "Slipaway"
       1973 19-6 "Emily Lynn"
      

February 01, 2012, 07:15:12 PM
Reply #2

dirtwheelsfl

  • Information Offline
  • Master Rebuilder
  • Posts: 808
Re: Stringer rebuild question..
« Reply #2 on: February 01, 2012, 07:15:12 PM »
took the words right out of my mouth!  i might add another layer tabbing into the hull bottom to the sides of the stringers, maybe 8" wide or so...

February 01, 2012, 07:17:21 PM
Reply #3

gman 82 aquasport

  • Information Offline
  • Master Rebuilder
  • Posts: 594
Re: Stringer rebuild question..
« Reply #3 on: February 01, 2012, 07:17:21 PM »
Thanks, I felt like 2 layers was about right, than 2 more for the plywood caps....it should out survive me.. :pirat:
1982 19-6 Osprey
1992 Johnson 150
"THERAPY"
Member # 2331

 


SimplePortal 2.3.5 © 2008-2012, SimplePortal