So I have everything I need to coat the deck with durabak 18, refinish the teak with teak guard, cut holes in the rear compartments to replace the thru hulls and add ball scuppers, then put deck hatches over the holes cut to get to the scuppers, and replace old hardware around the boat!  This should keep me bust for a while!

Mike

June 16, 2011, 08:43:38 PM
Reply #1

seabob4

  • Information Offline
  • Rigging Master
  • Posts: 9087
Re: Lots of work to do!
« Reply #1 on: June 16, 2011, 08:43:38 PM »
Love it when the UPS guy shows up!! :cheers:


Corner of 520 and A1A...

June 16, 2011, 09:03:33 PM
Reply #2

Mcdiver

  • Information Offline
  • Posts: 203
Re: Lots of work to do!
« Reply #2 on: June 16, 2011, 09:03:33 PM »
Well I began tonight.  I connected the VHF and gps, then took the two rear hatches off to start sanding and cleaning.  I'll take some pics as I go!
Mike

June 17, 2011, 11:47:54 AM
Reply #3

jdupree

  • Information Offline
  • Posts: 959
Re: Lots of work to do!
« Reply #3 on: June 17, 2011, 11:47:54 AM »
Welcome to boat ownership!!!  Looks good!  Can't wait to see thie finished product!  You are making me look like I didn't take care of the old girl :wink:
John L. Dupree, III
1999 Aquasport 245 Explorer - 225 Johnson Ocean Pro
AQABLA84E999
Member #257

June 17, 2011, 12:01:41 PM
Reply #4

gran398

  • Information Offline
  • Purgatory
  • Posts: 7440
    • http://www.ascottrhodes.com
Re: Lots of work to do!
« Reply #4 on: June 17, 2011, 12:01:41 PM »
:lol:

Hey Mikey, I couldn't figure out what those four blue things were for at first....thought they may be Coozies for some of those feminine energy drinks... :flower:

June 17, 2011, 12:29:39 PM
Reply #5

wingtime

  • Information Offline
  • Posts: 3581
    • http://50newtmotorclub.shutterfly.com/
Re: Lots of work to do!
« Reply #5 on: June 17, 2011, 12:29:39 PM »
Quote from: "gran398"
:lol:

Hey Mikey, I couldn't figure out what those four blue things were for at first....thought they may be Coozies for some of those feminine energy drinks... :flower:


LOL yeah it took me a moment to figure out that they were foam rollers too!  LOL
1998 Explorer w/ Etec 250


1987 170 w/ Evinrude 90

June 17, 2011, 12:36:39 PM
Reply #6

Capt. Bob

  • ***
  • Information Offline
  • Global Moderator
  • Posts: 6435
Re: Lots of work to do!
« Reply #6 on: June 17, 2011, 12:36:39 PM »
Quote from: "jdupree"
You are making me look like I didn't take care of the old girl :wink:

From that pic JD, I'm surprised she still floated. :lol:

I see that's a different brand of teak guard than I used. I'd be curious how it works out.
]
Capt. Bob
1991 210 Walkaround
2018 Yamaha 150 4 Stroke
"Reef or Madness IV"

June 17, 2011, 05:28:00 PM
Reply #7

Mcdiver

  • Information Offline
  • Posts: 203
Re: Lots of work to do!
« Reply #7 on: June 17, 2011, 05:28:00 PM »
Nah john, you took great care of her, but you know how I am.  I've been collecting parts for a few months.  The next thing is trim tabs.  But I need to finish these projects first.  

In reality, jd you inspired me.  All the work we've been doing to yours, I couldn't let the old girl fall behind.
Mike

June 18, 2011, 05:13:30 PM
Reply #8

Mcdiver

  • Information Offline
  • Posts: 203
Re: Lots of work to do!
« Reply #8 on: June 18, 2011, 05:13:30 PM »




So here are some pics.  I was able to get the teak stripped and todays 2 Coates on it.
Mike

June 18, 2011, 05:42:45 PM
Reply #9

RickK

  • *****
  • Information Offline
  • Administrator
  • Posts: 11076
Re: Lots of work to do!
« Reply #9 on: June 18, 2011, 05:42:45 PM »
Rick
1971 "170" with 115 Johnson (It's usable but not 100% finished)

1992 230 Explorer with 250 Yamaha

June 19, 2011, 01:11:25 PM
Reply #10

Mcdiver

  • Information Offline
  • Posts: 203
Re: Lots of work to do!
« Reply #10 on: June 19, 2011, 01:11:25 PM »
4 Coates of teak guard done!  Hatches look great!  Gonna let it sit for the rest of the day and do 1 more before bed!
Mike

June 21, 2011, 08:41:17 PM
Reply #11

Mcdiver

  • Information Offline
  • Posts: 203
Re: Lots of work to do!
« Reply #11 on: June 21, 2011, 08:41:17 PM »
So today I came home and decided to work on the boat.  I started by buffing the side out to get it ready for the new decals for the sides.  Got one side done, one to go.







Also put the refinished rear hatches on!  They look great!  Now to do the rest of the teak.
Mike

June 22, 2011, 04:54:48 PM
Reply #12

Mcdiver

  • Information Offline
  • Posts: 203
Re: Lots of work to do!
« Reply #12 on: June 22, 2011, 04:54:48 PM »
Just ordered the bennett m120 tabs with the eic controller.  $583.00.  Delivered.

www.northernmarineelectronice.com
Mike

July 10, 2011, 05:24:26 PM
Reply #13

Mcdiver

  • Information Offline
  • Posts: 203
Re: Lots of work to do!
« Reply #13 on: July 10, 2011, 05:24:26 PM »
Spent the day yesterday working on the boat.  Got the tabs installed and wired, not hooked up yet, but installed.  Replaced the thru hull fittings for the self bailers, and installed the new hatches where I had to cut the holes in the rear of the boat.  

Then I got all of the teak out, removedthe coffin box, and removed the leaning post.  Sore as heck today, but well on the way to having my projects completed.

Complete the teak, coat the deck and it's done!
Mike

July 10, 2011, 05:49:50 PM
Reply #14

pete

  • Information Offline
  • Posts: 1420
Re: Lots of work to do!
« Reply #14 on: July 10, 2011, 05:49:50 PM »
It won' be long now! :cheers: